The mold can go into the air as we're cleaning it and that's why we've got air scrubbers in the building and we'll run them as we clean and for a period of time after we clean.

There are other projects with pressing needs that have taken priority at this point in time.

In the winter you have warm, moist air going through the HVAC system coming out of a cool metal diffuser on a surface where it can condense and that can create an environment where it's possible for mold to grow.

We are not aware of any mold issue in this school today, and the school was inspected this morning by Health Services for the system and no issues were found.

If we could put everybody in a brand new building we would. What we need to do is maintain the buildings we have. We would not put students in a school we felt was unhealthy.