That's the one thing we haven't gotten a Band-aid on so to say. But, we are going to bring in an engineer to work on it. It is being addressed.

Essentially, we've completed the things we agreed that we would. Also, we're looking into the installation of a pump in the basement or the elevator shaft. The continued rains, if we get some, could be a problem and we recognize that. This wouldn't be a permanent one for the building, but it would be sufficient enough to keep the water out.