The building is heated hydronically, entirely by hydro-air, ... We built the heating system around 11 primary water-to-air heat exchangers that range in capacity from 3,500 to 18,500 cfm per unit.

The more someone persists in their innocence, the larger the wound gets in the community. You can't heal in a case like this when the finger is in the wound at the heart of the community ? the way the knife was in the victim.

To complete the heating loop system, we'd make 5-degree angle welds in the black pipe to accommodate the curvature of the building. To say the least, this was very time consuming. We had three [ twoman] welding crews working non-stop on the primary loop for four months.

We certainly havent lost any of the faith we have in the Carnival.

All of these devices permit fine-tuning of zoned temperatures, ... Each of the remote units is separately piped with supply and return lines.