One of the reasons for building the overpass and the Nile Valley Drive was to lower the volume of traffic on Highway 35 and Highway 60 to 20 percent. The new drive was named after the old Nile Valley Canal Co., which owned the canal and operated in the area. The overpass structure weighs 620 tons. -Clark Young

 

One of the reasons for building the overpass and the Nile Valley Drive was to lower the volume of traffic on Highway 35 and Highway 60 to 20 percent. The new drive was named after the old Nile Valley Canal Co., which owned the canal and operated in the area. The overpass structure weighs 620 tons.


Comments

There are not yet any comments on this quote. Why not register / login and be the first?




This quote is just one of 2 total Clark Young quotes in our collection. Clark Young is known for saying 'One of the reasons for building the overpass and the Nile Valley Drive was to lower the volume of traffic on Highway 35 and Highway 60 to 20 percent. The new drive was named after the old Nile Valley Canal Co., which owned the canal and operated in the area. The overpass structure weighs 620 tons.' as well as some of the following quotes.

One of the reasons for building the overpass and the Nile Valley Drive was to lower the volume of traffic on Highway 35 and Highway 60 to 20 percent. The new drive was named after the old Nile Valley Canal Co., which owned the canal and operated in the area. The overpass structure weighs 620 tons.

Clark Young

Operation is the key to the whole success.

Clark Young