Because of the growth of the community, we've had to increase manpower over the years. So we've outgrown these two stations considerably.

We've been planning for this for several years, and the original budget for the renovations was $500,000 (for each station), but that ended up being about $250,000 short.

Part of it was just inflation, but a big reason for the increase is we have to bring those two stations up to the 2003 building code, which requires them both to have sprinkler systems. That was something I hadn't budgeted for. When I found out about it, the hair went up on the back of my neck.